Egypt
Solar Pump System PS200
Location: Marsa Alam, Red Sea region
Vertical Lift: 30 m97 ft97 ft
Flow Rate: 5.7 m31,520 US Gal.1,270 UK Gal./day
Installation: 2010
Solar Pump System PS600
Location: Al Baharia 2, El Wahat
Vertical Lift: 4.0 m13 ft13 ft
Flow Rate: 100 m327,000 US Gal.22,000 UK Gal./day
Drinking Water Supply
Solar Generator: 480 Wp
Installation: November 2009
Solar Pump System PS600
Location: Al Baharia 1, El Wahat
Vertical Lift: 40 m130 ft130 ft
Flow Rate: 14 m33,730 US Gal.3,110 UK Gal./day
Drinking Water Supply
Solar Generator: 520 Wp
Installation: November 2009
Solar Pump System PS1800
Location: Al Fayoum
Vertical Lift: 5.0 m16 ft16 ft
Flow Rate: 250 m367,000 US Gal.56,000 UK Gal./day
Drinking Water Supply
Solar Generator: 1.4 kWp
Installation: September 2009
Solar-powered Cooling Devices
Location: Al Baharia 3, El Wahat
Solar Generator: 240 Wp
Installation: August 2009
LORENTZ Partners: Egypt
Acropol, Cairo