Ethiopia
Solar Pump System PS1800
Location: Amhara Regional State, Kemisse
Total Dynamic Head (TDH): 8.0 m26 ft26 ft
Flow Rate: 60 m316,000 US Gal.13,000 UK Gal./day
Installation: March 2010
© 2012 LORENTZ | All rights reserved.
Location: Amhara Regional State, Kemisse
Total Dynamic Head (TDH): 8.0 m26 ft26 ft
Flow Rate: 60 m316,000 US Gal.13,000 UK Gal./day
Installation: March 2010