Kenya
Solar Pump System PS1800
Location: Maili Tisa
Vertical Lift: 85 m270 ft270 ft
Flow Rate: 40 m311,000 US Gal.8,900 UK Gal./day
Drinking Water Supply
Solar Generator: 2.2 kWp
Installation: November 2011
Solar Pump System PS1800
Location: Nairobi
Total Dynamic Head (TDH): 160 m520 ft520 ft
Flow Rate: 8.0 m32,130 US Gal.1,780 UK Gal./day
Drinking Water Supply
Solar Generator: 680 Wp
Installation: January 2011
Solar Pump System PS1800
Location: Ramada, MDA Health Centre
Vertical Lift: 250 m810 ft810 ft
Flow Rate: 24 m36,400 US Gal.5,300 UK Gal./day
Drinking Water Supply
Solar Generator: 4.7 kWp
Installation: September 2010
Solar Pump System PS4000
Location: Masaai Mara 2, Narok
Total Dynamic Head (TDH): 160 m520 ft520 ft
Flow Rate: 40 m311,000 US Gal.8,900 UK Gal./day
Drinking Water Supply
Solar Generator: 4.9 kWp
Installation: December 2009
Solar Pump System PS1800
Location: Kitale
Total Dynamic Head (TDH): 50 m160 ft160 ft
Flow Rate: 20 m35,300 US Gal.4,440 UK Gal./day
Drinking Water Supply
Solar Generator: 800 Wp
Installation: May 2009
Solar Pump System PS600
Location: Lamu Island
Drinking Water Supply
Solar Generator: 4.7 kWp
Installation: October 2008
Solar Pump System PS600
Pool Filtration
Location: Masaai Mara 1, Narok
Total Dynamic Head (TDH): 2.0 m6.5 ft6.5 ft
Flow Rate: 12 m33,200 US Gal.2,670 UK Gal./day
Net-independent Power Supply
Location: Masaai Mara 1, Narok
Solar Generator: 7.9 kWp
Installation: December 2007
Solar Pump System PS1200
Pool Filtration
Location: Lewa Wildlife Conservancy
Vertical Lift: 80 m260 ft260 ft
Flow Rate: 19 m35,100 US Gal.4,220 UK Gal./day
Net-independent Power Supply
Location: Lewa Wildlife Conservancy
Solar Generator: 1.3 kWp
Installation: March 2005
Solar Pump System PS600
Pool Filtration
Vertical Lift: 10 m32 ft32 ft
Flow Rate: 6.5 m31,730 US Gal.1,440 UK Gal./day
Net-independent Power Supply
Solar Generator: 240 Wp
Installation: January 2004
LORENTZ Partners: Kenya









