pump system: PS2-1800 C-SJ3-18
flow rate: 10 m³/day
total dynamic head (TDH): 115 m
solar generator: 2.0 kWp
Sierra Leone
Brunnenbau Conrad
March 2024
This project was Executed by Brunnenbau Conrad SL Ltd and assigned to us by the United Nation Development Program Sierra Leone to drill Borehole and construct a Tower with a capacity of 10,000 liter tanks to improve Water facility at the Correctional Center (Prison) in Kenema District.