pump system: PS2-600 C-SJ5-8
flow rate: 55 m³/day
total dynamic head (TDH): 35 m
solar generator: 1.4 kWp
Poiana Mare
Romania
EcoElectrom Energy
June 2021
A StartUp company located in the south of Romania that planted 1,5 ha of trees for biomass.
The instalation requires 3000 liters/day.
Optimal PC instalation for summer mounts production.





